Since 1938
Moving Air More Efficiently
AcmeHort.com
Acme's Fan Selection Software   Downloads  
FANtastic!® v2.0.5 01/01/2018  

Enter Login Information Below
User Name:
Password:
Browser Compatibility
 Announcements

KOOL CEL CSEG TRANSITIONING TO NEW CSBG SYSTEM

For those of you who have become familiar with ACME’s Kool Cel CSEG system, we will be sunsetting that design in 2026. ACME’s OSEG system has already transitioned to the OSBG and the CSEG will soon transition to the CSBG. What’s the difference you ask? The EG systems required connectors to glue gutters together and it was a costly and labor-intensive. The new BG systems (Bell Gutters) have gutter sections with a bell on one end so lengths of gutters can be easily setup and glued simultaneously. No more wrestling gutters to fit connectors for glue up. No more wasted man hours needing multiple people to glue pieces together or having to wait for a connection to harden before moving to another piece of gutter. Simply clean all your surfaces, glue and overlap the gutter and bell for a precise, easy glue up. Use the supplied clips and rods to hold everything in place while you move on to the next section for glue up.

CSEG parts will remain active until March 31, 2026 or until inventory is used up, whichever occurs first. Should any inventory remain after March 31, it will be used up by the new CSBG system. CSEG specific parts, like gutter connectors, will only be offered as replacement parts until inventory is zeroed out.

We look forward to officially releasing this new, low cost system to the masses. If you attended Cultivate in 2025, you already got to see the new system in person. If you have any further questions, please contact Joe Talbot (jtalbot@acmefan.com) or Nick Miller (nmiller@acmefan.com).

Kool Cel System Design Manual

OSBG/CSBG Product Flyer

Clarification on DC → DB Transition

We want to address recent questions regarding the future of the DC fan. Please note the following:

  • NCM Market → Fully transitioning from the DC fan to the DB fan.
  • Horticulture Market → Will continue selling the DCWS with no changes.
  • Standalone DC Fan → Will be replaced by the DB fan going forward.

A detailed DC vs. DB comparison sheet will be shared soon. As the DB is more fully integrated, it will become the standard product across all markets.

We apologize for any confusion and appreciate your attention to this important update.

For additional questions, please contact:

Joe Talbot – jtalbot@acmefan.com
Nick Miller – nmiller@acmefan.com

Important Notice to Acme Customers

 

 

All PO’s must include an onsite contact name and phone number for trucker contact. We are trying to avoid potential surcharges related to insufficient contact info for the driver.

 

All Acme products are sold F.O.B. Shipping Point and the attached memorandum copy of Bill of Lading indicates that material shipped has now, by Federal Law, become Your Property and is an acknowledgement by the Transportation Company of the receipt of the material in good condition.

 

Safe Delivery of this shipment is now the Responsibility of the Carrier who acts as Your Agent.  We will be glad to render assistance to trace and recover lost goods.

 

Examine shipment carefully before signing freight bill.  If there is any Damage, or if the Number of Pieces received Does Not agree with the Bill of Lading, insist that shortage or damage be noted on the freight bill by the carrier’s agent.  Failure to do so may jeopardize your recovery.

 

If a product has significant Damage (beyond field repair), refuse the delivery of that item only and promptly notify Acme of the refusal.

 

If any concealed Damage or Shortage is discovered when unpacking, Leave Material and Packing As Is and Notify agent of carrier immediately to inspect and make reference thereto on the freight bill.  Consult Carrier for Disposition of Damaged Articles.

 

Make your claim promptly. The transportation company will not consider a claim unless presented within nine months from date of shipment.  Carrier’s agent will assist you in preparing claim.

 

Claims for loss or damage and transportation charges resulting therefrom must not be deducted from the invoice, nor payment of invoices withheld awaiting adjustment of such claims, since it is the function of the carrier to guarantee safe delivery.

 

Check Items Received With the Invoice.  If there is any discrepancy contact us immediately giving full particulars.  Claims for shortage attributed to our count in packing Must Be Made Within 10 Days From Date Shipment Is Received.

 

NO MERCHANDISE MAY BE RETURNED FOR CREDIT WITHOUT A RETURN GOODS TAG AND SHIPPING INSTRUCTIONS FROM THE FACTORY.